Mill test certificate: trace a heat number to the pipe

A mill test certificate only proves a pipe when the heat number, the grade and the tests on the paper match the marking on the steel.

Format
Explainer
Published
Duration
2 min 15 sec
Language
English
Full explainer series: Junda Explainers

About this video

This explainer is educational. It explains the published limits and the order fields for the topic; confirm the grade, standard, size, condition, inspection and documents with Junda for each order.

Chapters

Each chapter opens the video at that point on YouTube.

  1. 0:00

    What a mill test certificate has to reconcile

    A mill test certificate can be complete, signed, and still describe the wrong pipe. The link between the paper and the steel is one number. Traceability starts before the steel is made. The purchase order names the product, the grade, the standard and its edition. The certificate and the test report have to match that line. The marking, the packing list and the receiving record close the chain, or they leave it open. Three fields decide whether a certificate belongs to your order. The order and item reference, with the grade and the standard edition. The heat number, and the heat analysis that belongs to it. The test results, each required by the ordered specification.

  2. 0:41

    Heat number traceability from raw material to marking

    The number starts with the raw material, and it never changes. Cold forming, solution heat treatment, pickling, straightening, cutting, inspection. Every step keeps the same heat, because the tests belong to it. The same heat has to appear on the pipe itself. Mills mark the wall by ink-jet, electrochemical etching or low-stress vibro-etching. A mark you cannot read is a link you cannot check. The finished pipes are bundled, and the label carries the heat again. Tag, packing list and certificate have to read the same.

  3. 1:14

    EN 10204 3.1 vs 3.2 inspection certificates

    Type 3.1 is issued by the mill, and validated by its own inspection. That inspector is independent of production. Type 3.2 adds an inspector independent of the mill, or a third party. The project specification picks which one. Read the certificate for what it is. It documents that the product was tested against the stated requirements. It does not by itself prove fitness for your process or your pressure design.

  4. 1:41

    When the certificate and the marking disagree

    A mismatch is a finding, not a conversation. A different edition, a quantity that does not reconcile, a mark you cannot read. Each one holds the batch until a non-conformance report and a signed addendum close it. Write the document requirement into the purchase order. The certificate type, the standard and its edition. The tests, their method and their acceptance criteria. The marking, the packing list, and who inspects third party. Junda confirms the documents in the quotation.