Short · 48 s
Seamless tube: seven steps, no weld #shorts
The seamless tube route starts from a hollow, not a sheet: cold forming, heat treatment, pickling, straightening, cutting and inspection.
- Format
- Short
- Published
- Duration
- 48 sec
- Language
- English
About this video
This Short is the one-minute version of the seamless-tube explainer. The seven steps are the process Junda publishes; the certificate scope and the inspection plan are confirmed in the quotation.
Chapters
Each chapter opens the video at that point on YouTube.
- 0:00
The seamless pipe manufacturing process starts with a hollow, not a sheet.
The wall follows the pass: it comes down while the outside and the bore are held.
- 0:13
The published range is 6 to 630 millimetres outside diameter, and 0.2 to 80 millimetres of wall.
That is what the route can make, not what is on the shelf. A furnace leaves an oxide layer on the surface.
- 0:26
The fourth step is pickling: an acid tank takes that layer off, and six published systems do the work.
None of those steps starts a new identity: the heat number is written at the raw material. So the certificate can tie the delivered length back to the heat that was tested. The full route is on our channel.
Specify the pipe or tube for your project
Send the grade, standard, OD × wall × length, wall basis, quantity, inspection and documents with your enquiry.
